One pool, one morning
Four photographs of the same joint between 8:27 and 12:24 on one morning. Cut out, cleaned back, rod set, sealed.




No stock pools, no staging. Failed joints we were called to fix and the commercial grade sand finish mastic we replaced them with.
Real footage. Full removal and replacement, start to finish.
Before & After
BEFORE
AFTERA split, pulled away joint replaced with fresh grey sand finish mastic in a single visit.
BEFORE
AFTERWater was tracking straight under the deck. Now the joint flexes and sheds water the way it should.
On The Job
A failed joint, the old material worked out of it, the new bead going in, and the deck it leaves behind. Shot on the job, no narration and no music.
From Our Jobs
These are our own photographs, not stock. Where we hold more than one photo of the same site we have kept them together, so you can see the sequence rather than a flattering close up.
Four photographs of the same joint between 8:27 and 12:24 on one morning. Cut out, cleaned back, rod set, sealed.




The rod goes in following the curve, then the bead follows it. A curve is where a rushed joint always shows.


Rod set at 8:40, the whole run sealed and back in service by 16:11 the same day.




The Work
Failed joints, rod set to depth, and finished beads in grey and tan, across pool decks, driveways and walkways.



















Every photograph here is our own work. Locations are withheld and the camera data, including GPS, is stripped from every file before it reaches this page.
One day apart
Field Gallery
Precision Removal
Joint Cleaning
Edge Detail
Backer Rod Set
Full Removal
Sand Finish
Clean Lines
On The Job